View text source at Wikipedia
Chinese name | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Chinese | 姬堂站 | ||||||||||
| |||||||||||
General information | |||||||||||
Location | Fork of Fengle North Road (丰乐北路), Jitang Changqing Street (姬堂长庚街) and Changsheng Street (长盛街), Huangpu District, Guangzhou, Guangdong China | ||||||||||
Coordinates | 23°08′04″N 113°27′02″E / 23.134581°N 113.450569°E | ||||||||||
Operated by | Guangzhou Metro Co. Ltd. | ||||||||||
Line(s) | Line 7 | ||||||||||
Platforms | 2 (1 island platform) | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
Accessible | Yes | ||||||||||
Other information | |||||||||||
Station code | 715 | ||||||||||
History | |||||||||||
Opened | 28 December 2023 | ||||||||||
Services | |||||||||||
|
Jitang Station (Chinese: 姬堂站; pinyin: Jītáng Zhàn; Jyutping: gei1tong4 zaam6) is a station of Guangzhou Metro Line 7, located underground at the fork of Fengle North Road, Jitang Changqing Street and Changsheng Street in Guangzhou's Huangpu District.[1] It opened on 28 December 2023, with the opening of Phase 2 of Line 7.[2]
The station was handed over to the '3 Powers' on 31 October 2023 for territorial management and operation of the station and facilities.[3]
G | Street level | Exits A, B, D, E |
L1 Concourse |
Lobby | Ticket Machines, Customer Service, Shops, Police Station, Safety Facilities |
L2 Platforms |
Platform 2 | 7 towards Meidi Dadao (Dashadong) |
Island platform, doors will open on the left | ||
Platform 1 | 7 towards Yanshan (Jiazhuang) |
Exit letter | Exit location | |
---|---|---|
A | Fengle North Road | |
B | Fengle North Road | |
D | Fengle North Road | |
E | Fengle North Road |
The station is planned to have an interchange with Line 19.[4]