REG Windpower is one of the UK’s leading developers[according to whom?] and operators of small to medium-sized wind farms, operating nine sites in England and one in Wales, with a combined operational capacity of 41.15 MW.[1]
The ultimate parent company Renewable Energy Generation Limited, registered in Jersey, was put into liquidation in January 2016.
REG Windpower was founded as the Cornwall Light and Power Company in 1989, and changed its name to REG Windpower in 2010.
REG Windpower is owned by Renewable Energy Generation Ltd.
As well developing, building and operating wind farms, the group also generates renewable energy from used cooking oil through its subsidiary company REG Bio-Power.
In October 2011, REG Windpower launched public consultation on several new wind farms in England.
If completed, these projects will have a combined installed capacity of almost 50 MW.
REG Windpower has attracted criticism over their selection of some of their development sites.
Old River Don wind farm - the site chosen for 6 turbines was the site of two World War II graves. A Lancaster bomber crashed in September 1945 and two Australian airmen were never found. The location of one of the turbines was to be close to where the crash site was believed to be.[16][17]
Knockshinnoch Wind Farm - East Ayrshire Council Planning Committee granted consent for the site on 30 January 2015 despite an objection from West of Scotland Archaeology Service due to the existence of Carline Knowe,[18] a prehistoric cairn sitting just a few metres from the base of the turbines. The site is located 200 metres from the edge of Dunstonhill surface mine which was abandoned following the collapse of Scottish Coal in April 2013. Many local residents were unhappy with further development in this area while Dunstonhill blighted the landscape.[19] The site also sits just 488 metres from the nearest home despite Scottish Government Guidance recommending a minimum separation distance for this size of turbine (126.5 metres height) being 900 metres. In total 26 separate planning policies and guidance were breached however the Planning Committee overturned the advice of the Planning Department to refuse.[20]
Companies with headquarters and/or registered office in the UK but no applicable energy operations within the country shown in italics1Ultimate parent company is not UK-based 2Integrated in the United States, no generation or supply activities in the UK