View text source at Wikipedia
Ciel Dubai Marina | |
---|---|
Alternative names |
|
Hotel chain | Vignette Collection |
General information | |
Status | Topped-out |
Type | Hotel |
Location | Dubai Marina, Dubai, United Arab Emirates |
Construction started | 2018 |
Completed | January 2025 (projected) |
Owner | Immo Prestige Limited |
Management | IHG Hotels & Resorts |
Height | |
Architectural | 374 m (1,227 ft) |
Technical details | |
Material | Steel and concrete |
Floor count | 82 |
Design and construction | |
Architect(s) | Yahya Jan |
Architecture firm | NORR Group Consultants International Limited |
Developer | The First Group (company) |
Main contractor | China Railway 18th Bureau Group LLC |
Other information | |
Number of rooms | 1,042 |
Number of suites | 150 |
Website | |
www |
The Ciel Dubai Marina is a skyscraper under construction in Dubai, United Arab Emirates. With a structural height exceeding 366 metres (1,201 ft), it is intended to be the tallest hotel-only building in the world when is completed in 2025.[1]
The skyscraper is being built according to plans by NORR group Vice President of Global Marketing Melanie Kurzuk. The sculpture-like design is characterized by tapers in the upper and lower parts of the building, a silver-colored facade and concise recesses in the upper part of the building. A bar and infinity pool are due to be located there.[2]
Over 1,042 rooms, including 150 suites, are to be spread across the tower's 82 floors.[3] Approximately 12,000 cubic metres (420,000 cu ft) of concrete and over 2,700 tonnes (3,000 short tons) of steel were used for the skyscraper's foundation.[4]
Completion was scheduled for 2023, with the building proposed to open in 2024.[5] The developer First Group has stated that the opening would be in the first quarter of 2024.[needs update][6]
{{cite web}}
: CS1 maint: multiple names: authors list (link)